OUR PROJECTS

Singapore Power (SP Group) – East West Transmission Cable Tunnel Project

ABOUT THIS PROJECT

Powering the Nation

The conventional method of overcoming voltage drop in long distance transmission is to use sufficiently sized cables to cater accordingly. These cables are expensive and can amount to a hefty sum of money.

 

Ashley-Edison Constant Voltage Compensators

In 2016, Ashley-Edison’s Constant Voltage Compensators were installed to boost low voltage levels at the end of the tunnel while regulating and maintaining an optimum output voltage, regardless of load change. Adopting this configuration has helped our client save millions of dollars that would have otherwise been spent on cabling costs.

For this crucial application, we conduct annual maintenance servicing on our Constant Voltage Compensators to eliminate any possible downtime.

client
Singapore Power (SP Group)
PROJECT COMPLETION
2016
EQUIPMENT SIZE
Up to 500KVA, 12 units
Scroll to Top

Form Sent!

Thank you for getting in touch with us.

We will be in contact shortly.